PROJECT PLANNING AND CONTROLLING THE CONSTRUCTION PROJECT OF A HOSPITAL HEMODIALYSIS UNIT LOCATED IN TANGERANG USING THE CRASHING METHOD

Dinariana, Dwi and Suryani, Fitri and Nurachman, Ryan PROJECT PLANNING AND CONTROLLING THE CONSTRUCTION PROJECT OF A HOSPITAL HEMODIALYSIS UNIT LOCATED IN TANGERANG USING THE CRASHING METHOD. Asian Journal of Engineering, Social and Health. (Unpublished)

[img] Text
PROJECT PLANNING AND CONTROLLING THE CONSTRUCTION PROJECT OF A HOSPITAL HEMODIALYSIS UNIT LOCATED IN TANGERANG USING THE CRASHING METHOD.pdf

Download (4MB)

Abstract

The research was carried out by project planning and controlling to analyze the time duration and cost of adding labor and overtime hours at work on amendments to the construction of a hospital Hemodialysis unit located in Tangerang with the accelerated crashing method. Research analysis to see project planning and project control of amendments to the work of building a Hemodialysis unit for Crashing analysis work carried out by the accelerated method of adding working hours, adding labor and the combination of time duration to find the most optimal value.

Item Type: Other
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Dr. Ir. Dwi Dinariana MT
Date Deposited: 27 Feb 2024 01:58
Last Modified: 27 Feb 2024 01:58
URI: http://repository.upi-yai.ac.id/id/eprint/10583

Actions (login required)

View Item View Item