Risk management maturity of the supervising consultant on quality and time performances in construction building

fitri, suryani Risk management maturity of the supervising consultant on quality and time performances in construction building. Risk management maturity of the supervising consultant on quality and time performances in construction building.

[img] Text
scopus Risk management maturity of the supervising consultant on.pdf

Download (1MB)
Official URL: https://iopscience.iop.org/article/10.1088/1742-65...

Abstract

abstract. Construction of buildings has a complex type of work. Detailed work does not only refer to the technical specifications and drawing plans that have been set, but there are also construction norms and work steps that need to be understood by the Supervising Consultant in achieving project objectives. There are often problems wit h quality and time control, so the ability to manage risk from the Supervising Consultant needs to be known and analyzed. Based on this analysis, it can be determined the level of risk maturity of the Supervising Consultant in overseeing the implementation of building construction. The purpose of this study is to obtain the maturity level of the Supervising Consultant in managing risks related to quality and time performances. This study uses descriptive analysis and Analytic Hierarchy Process (AHP) to get category in risk control. The results of the study indicate that the Enterprise Risk Maturity criteria assessor obtained maturity level 4. This means that the Supervising Consultant has a supervisory system on the implementation of risk management, the principles have been implemented and accompanied by periodic improvements in terms of control.

Item Type: Article
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: Dr. Ir. MT Fitri Suryani
Date Deposited: 14 Feb 2021 05:37
Last Modified: 14 Feb 2021 05:37
URI: http://repository.upi-yai.ac.id/id/eprint/2621

Actions (login required)

View Item View Item