Hasil Similarity - Readiness and Influence of Value Engineering Implementation at the Construction Center of the Ministry of Defense of the Republic of Indonesia (Case Study of Belawan Hospital Construction)

Bismantara, Resi and Dinariana, Dwi and Jayady, Arman and Suryani, Fitri and Nugraha, Hari (2021) Hasil Similarity - Readiness and Influence of Value Engineering Implementation at the Construction Center of the Ministry of Defense of the Republic of Indonesia (Case Study of Belawan Hospital Construction). Published by Quest Journals. (Unpublished)

[img] Text
TURNITIN_Internas 6_Readiness and Influence of Value Engineering Implementation at the Construction Center of the Ministry of Defense of the Republic of Indonesia.pdf

Download (3MB)

Abstract

Abstract. The current condition of the Construction Center of the Ministry of Defense of the Republic of Indonesia (Construction Center) has not implemented value engineering in the implementation of construction development. The research is intended to determine how much influence the application of value engineering methods has in increasing value and how ready the institution is to apply the value engineering method. To achieve these two objectives, the researcher uses the method of applying 6 stages of value engineering studies, Life-Cycle Cost Analysis, frequency distribution analysis, multiple linear regression analysis and correlation analysis. The results of the value engineering study on the construction of the Belawan Hospital in Medan resulted in savings of Rp. 3,592.415,520.0 or 5.05 percent of the value of the building, increasing the value in terms of environmentally friendly functions, durability of walls, preventing excessive humidity in the room and saving time for plastering implementation as much as 6373 peopleday. The research also proves that the Construction Center is not yet fully ready to implement value engineering studies where the relationship between the readiness to apply the VE study at the Construction Center (Y) as the dependent variable, and the availability of defense secrecy regulations, the availability of VE study regulations, the availability of detailed guidance on VE and the availability of service provider support (X1,X2,X3 and X4 respectively as independent variables) is described in the equation Y = - 0.959 + 0.284 X1 + 0.457 X2 + 0.239 X3 + 0.217 X4.

Item Type: Other
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Dr. Ir. Dwi Dinariana MT
Date Deposited: 23 Jun 2023 06:01
Last Modified: 23 Jun 2023 06:01
URI: http://repository.upi-yai.ac.id/id/eprint/8335

Actions (login required)

View Item View Item